The goal of the Thai Net Metering Project is to help create 10 Megawatts of community-owned or small entrepreneur-owned, net-metered renewable energy in Thailand by the end of 2005. By September, 2005 this goal has been exceeded! However, the small percentage of applicants (16 out of 94) who are actually operational as VSPP generators may indicate bottlenecks in the VSPP process.

The following is a summary of grid-tied net-metered renewable energy systems in Thailand as of September 2005.

  Systems Capacity
Under Consideration 94 26.824 MW
Installed and Operating 16 16.683 MW
 

For full breakdown of systems, see: Detailed VSPP data -- Energy Plan and Policy Office


Application received

  MEA PEA
  # of projects kW # of projects kW
Solar PV 41 533 24 66.7
Biogas 1 1,200 18 6,736
Biomass 0 0 9 16,868
Municipal waste 0 0 1 1,420
Total 42 1,733 52 25,091

Note: kW refers to project capacity, not exported electricity

Generators connected under VSPP contract

  MEA PEA
  # of projects kW # of projects kW
Solar PV 1 1.5 1 3.1
Biogas 0 0 7 2,690
Biomass 0 0 7 13,990
Municipal Waste 0 0 0 0
Total 1 1.5 15 16,683

Note: kW refers to project capacity, not exported electricity.