Project Status
|
The goal of the Thai Net Metering Project is to help create 10 Megawatts of
community-owned or small entrepreneur-owned, net-metered renewable energy
in Thailand by the end of 2005. By September, 2005 this goal has
been exceeded! However, the small percentage of applicants
(16 out of 94) who are actually operational as VSPP generators may indicate
bottlenecks in the VSPP process.
The following is a summary of grid-tied net-metered renewable energy
systems in Thailand as of September 2005.
| |
Systems |
Capacity |
| Under Consideration |
94 |
26.824 MW |
| Installed and Operating |
16 |
16.683 MW |
|
|
|
For full breakdown of systems, see: Detailed
VSPP data -- Energy Plan and Policy Office
Application received
| |
MEA |
PEA |
| |
# of projects |
kW |
# of projects |
kW |
| Solar PV |
41 |
533 |
24 |
66.7 |
| Biogas |
1 |
1,200 |
18 |
6,736 |
| Biomass |
0 |
0 |
9 |
16,868 |
| Municipal waste |
0 |
0 |
1 |
1,420 |
| Total |
42 |
1,733 |
52 |
25,091 |
Note: kW refers to project capacity, not exported electricity
Generators connected under VSPP contract
| |
MEA |
PEA |
| |
# of projects |
kW |
# of projects |
kW |
| Solar PV |
1 |
1.5 |
1 |
3.1 |
| Biogas |
0 |
0 |
7 |
2,690 |
| Biomass |
0 |
0 |
7 |
13,990 |
| Municipal Waste |
0 |
0 |
0 |
0 |
| Total |
1 |
1.5 |
15 |
16,683 |
Note: kW refers to project capacity, not exported
electricity.
|